Solaris Virtualization Product Overview 1. Introduction to Solaris Resource Management 2. Projects and Tasks (Overview) 3. Administering Projects and Tasks 4. Extended Accounting (Overview) 5. Administering Extended Accounting (Tasks) 6. Resource Controls (Overview) 7. Administering Resource Controls (Tasks) 8. Fair Share Scheduler (Overview) 9. Administering the Fair Share Scheduler (Tasks) 10. Physical Memory Control Using the Resource Capping Daemon (Overview) 11. Administering the Resource Capping Daemon (Tasks) Introduction to Resource Pools Introduction to Dynamic Resource Pools About Enabling and Disabling Resource Pools and Dynamic Resource Pools Implementing Pools on a System SPARC: Dynamic Reconfiguration Operations and Resource Pools Directly Manipulating the Dynamic Configuration Managing Dynamic Resource Pools Configuration Constraints and Objectives poold Features That Can Be Configured Using poolstat to Monitor the Pools Facility and Resource Utilization Commands Used With the Resource Pools Facility 13. Creating and Administering Resource Pools (Tasks) 14. Resource Management Configuration Example 15. Resource Control Functionality in the Solaris Management Console 16. Introduction to Solaris Zones 17. Non-Global Zone Configuration (Overview) 18. Planning and Configuring Non-Global Zones (Tasks) 19. About Installing, Halting, Cloning, and Uninstalling Non-Global Zones (Overview) 20. Installing, Booting, Halting, Uninstalling, and Cloning Non-Global Zones (Tasks) 21. Non-Global Zone Login (Overview) 22. Logging In to Non-Global Zones (Tasks) 23. Moving and Migrating Non-Global Zones (Tasks) 24. About Packages and Patches on a Solaris System With Zones Installed (Overview) 25. Adding and Removing Packages and Patches on a Solaris System With Zones Installed (Tasks) 26. Solaris Zones Administration (Overview) 27. Administering Solaris Zones (Tasks) 28. Troubleshooting Miscellaneous Solaris Zones Problems 29. About Branded Zones and the Linux Branded Zone 30. Planning the lx Branded Zone Configuration (Overview) 31. Configuring the lx Branded Zone (Tasks) 32. About Installing, Booting, Halting, Cloning, and Uninstalling lx Branded Zones (Overview) 33. Installing, Booting, Halting, Uninstalling and Cloning lx Branded Zones (Tasks) 34. Logging In to lx Branded Zones (Tasks) 35. Moving and Migrating lx Branded Zones (Tasks) 36. Administering and Running Applications in lx Branded Zones (Tasks) 37. Sun xVM Hypervisor System Requirements 38. Booting and Running the Sun xVM Hypervisor 40. Using virt-install to Install a Domain |
How Dynamic Resource Allocation WorksThis section explains the process and the factors that poold uses to dynamically allocate resources. About Available ResourcesAvailable resources are considered to be all of the resources that are available for use within the scope of the poold process. The scope of control is at most a single Solaris instance. On a system that has zones enabled, the scope of an executing instance of poold is limited to the global zone. Determining Available ResourcesResource pools encompass all of the system resources that are available for consumption by applications. For a single executing Solaris instance, a resource of a single type, such as a CPU, must be allocated to a single partition. There can be one or more partitions for each type of resource. Each partition contains a unique set of resources. For example, a machine with four CPUs and two processor sets can have the following setup: pset 0: 0 1 pset 1: 2 3 where 0, 1, 2 and 3 after the colon represent CPU IDs. Note that the two processor sets account for all four CPUs. The same machine cannot have the following setup: pset 0: 0 1 pset 1: 1 2 3 It cannot have this setup because CPU 1 can appear in only one pset at a time. Resources cannot be accessed from any partition other than the partition to which they belong. To discover the available resources, poold interrogates the active pools configuration to find partitions. All resources within all partitions are summed to determine the total amount of available resources for each type of resource that is controlled. This quantity of resources is the basic figure that poold uses in its operations. However, there are constraints upon this figure that limit the flexibility that poold has to make allocations. For information about available constraints, see Configuration Constraints. Identifying a Resource ShortageThe control scope for poold is defined as the set of available resources for which poold has primary responsibility for effective partitioning and management. However, other mechanisms that are allowed to manipulate resources within this control scope can still affect a configuration. If a partition should move out of control while poold is active, poold tries to restore control through the judicious manipulation of available resources. If poold cannot locate additional resources within its scope, then the daemon logs information about the resource shortage. Determining Resource Utilizationpoold typically spends the greatest amount of time observing the usage of the resources within its scope of control. This monitoring is performed to verify that workload-dependent objectives are being met. For example, for processor sets, all measurements are made across all of the processors in a set. The resource utilization shows the proportion of time that the resource is in use over the sample interval. Resource utilization is displayed as a percentage from 0 to 100. Identifying Control ViolationsThe directives described in Configuration Constraints and Objectives are used to detect the approaching failure of a system to meet its objectives. These objectives are directly related to workload. A partition that is not meeting user-configured objectives is a control violation. The two types of control violations are synchronous and asynchronous.
The following events cause asynchronous objective violations:
The contributions of objectives that are not related to workload are assumed to remain constant between evaluations of the objective function. Objectives that are not related to workload are only reassessed when a reevaluation is triggered through one of the asynchronous violations. Determining Appropriate Remedial ActionWhen the resource controller determines that a resource consumer is short of resources, the initial response is that increasing the resources will improve performance. Alternative configurations that meet the objectives specified in the configuration for the scope of control are examined and evaluated. This process is refined over time as the results of shifting resources are monitored and each resource partition is evaluated for responsiveness. The decision history is consulted to eliminate reconfigurations that did not show improvements in attaining the objective function in the past. Other information, such as process names and quantities, are used to further evaluate the relevance of the historical data. If the daemon cannot take corrective action, the condition is logged. For more information, see poold Logging Information. |
||
|